I think it must have been drunk cross-eyed monkeys. I could not find a right angle in the whole basement. The goal for the long weekend (I took a extra day so that I had a 4 day weekend) was to finish framing the bathroom downstairs. It was a complete hassle. I did truly enjoy the time that I was able to spend with the kids. I gave Logan one of my tape measures and he was my “measure man”. He had so much fun and was a great help for a 4 year old. I got everything that I could done, at least I got all the hard stuff. I just need to make a straight wall for the storage room.